1. General Wage Increases
Rate
Current Minimum Wage Rate (hourly rates)
Rc
Increase on Actuals and Scheduled Wage Rates
Increase on Scheduled Wage Rates
R c
New Minimum Wage Rates
R c
A
29.41
5.20%
1.53
30.94
AA(6)
27.74
5.33%
1.48
29.22
AA(start)
26.22
5.47%
1.43
27.65
AB
24.75
5.60%
1.39
26.14
B
23.39
5.73%
1.34
24.73
C
22.25
5.87%
1.31
23.56
D
21.54
6,00%
1.29
22.83
DD
19.74
6.13%
1.21
20.95
DDD
18.65
6.27%
1.17
19.82
E
17.60
6.40%
1.13
18.73
F
16.65
6.53%
1.09
17.74
G
15.69
6.67%
1.05
16.74
H
14.81
6.80%
1.01
15.82
Whichever is the greater personal increase
2. Electric Cable (Schedule F)
Rate
Current Minimum Wage Rate Rc
Increase on Actuals and Scheduled Wage Rates
Increase on Scheduled Wage Rates
R c
New Minimum Wage Rates
R c
Rate Z
29.41
5.20%
1.53
30.94
Rate Y
22.90
5.36%
1.23
24.13
Group IX
21.50
5.52%
1.19
22.69
VIII
20.73
5.68%
1.18
21.91
VII
19.88
5.84%
1.16
21.04
VI
19.09
6,00%
1.15
20.24
V
18.29
6.16%
1.13
19.42
IV
17.51
6.32%
1.11
18.62
III
16.96
6.48%
1.10
18.06
II
16.29
6.64%
1.08
17.37
I
15.71
6.80%
1.07
16.78
Whichever is the greater personal increase
3. Structural engineering
Rate
Current Minimum Wage Rate
R c
Increase on Actuals and Scheduled Wage Rates
Increase on Scheduled Wage Rates
R c
New Minimum Wage Rates
R c
5
29.41
5.20%
1.53
30.94
4
26.42
5.52%
1.46
27.88
3
22.37
5.84%
1.31
23.68
2
18.08
6.16%
1.11
19.19
1
14.81
6.80%
1,01
15.82
1(a)
12.22
6.80%
0.83
13.05
Whichever is the greater personal increase
4. Apprentices
Year
CurrentMinimumWage Rateper Week
IncreaseonActual Rates
Weekly Increaseon MinimumRates
NewMinimum WeeklyWage Rates
First Year
R581
5,20%
R30
R611
Second Year
R641
5,20%
R33
R674
Third Year
R764
5,20%
R40
R804
Fourth Year
R1 131
5,20%
R59
R1 190
Whichever is the greater personalincrease